Various Mining and Industrial Facilities, Colorado
EA staff negotiated and prepared NPDES permit application for mining and industrial facilities. EA staff evaluated discharge data, receiving water conditions, analyzed permit limits, and submitted NPDES permit applications that were approved by regulatory agency staff. Permitting efforts resulted in cost-effective solutions for our clients permitting project.
El Segundo, California
EA staff designed and installed multiple storm water low impact development features to comply with the State of California’s Municipal Separate Storm Sewer System (MS4) permit for an active aerospace company in El Segundo, California. Responsibilities included preparation of state and local regulatory permits, storm water calculations and system equipment sizing and selection, cost estimates, project schedules, low impact development plans, coordination with multiple stakeholders, and field quality control during construction. Work consisted of installation of below grade storm water treatment features (infiltration trench, filtration units, biotreatment) to meet State of California storm water discharge requirements.
© 2022 Engineering Analytics, Inc.